    Schedule 10 SS304 cast pipe, welded with argon w/ backpurging on a Lincoln 185 using 309L 1/16" filler for tube joints and 308L on the head flange.



    That's the only teaser you guys get 'till it's nearly done.

  2. #2
    turbo addict
    Join Date
    Feb 2007
    Location
    Regina Sask Canada
    Posts
    1,629

    Re: Follow the tubes!

    Damn that is SO awesome. No power steering pump I guess.

  3. #3
    Rhymes with tortoise. Turbo Mopar Staff cordes's Avatar
    Join Date
    Dec 2005
    Location
    Tuscola, IL
    Posts
    21,465

    Re: Follow the tubes!

    yeah, if I had to guess, I would say it is goiin near where the PS would have been, or even farther up there since it is in an l body

  4. #4
    See me ride out of the sunset... Turbo Mopar Staff BadAssPerformance's Avatar
    Join Date
    Dec 2005
    Location
    Chicagoland!
    Posts
    27,701

    Re: Follow the tubes!

    looking good

    JT
    SDAC Director
    SDAC-Chicago President
    JOIN SDAC and your local Chapter TODAY! - SUPPORT the CLUB that supports YOUR HOBBY!
    87 Shelby Z - 10.50@141.66mph
    87 CSX #751 Clone - 12.88@102.88mph

    www.badassperformance.com
    Check out Turbo-Mopar Times!
    Submit your 1/4 mile times HERE!!

    Support SDAC! Join Today!
    "I'm not some pro athlete with a bajillion dollars, I'm just an every man"
    Note: The information and any images provided in this post are not for distribution outside this forum without the author's permission.

  5. #5

    Re: Follow the tubes!

    Nice! Aaron, by the time you are done building that you will see tubes in your sleep.
    best 1/8 ET-6.16 sec. best 1/8 speed-119.70 Best 1/4 MPH 145.5, Best 1/4 ET 9.65 sec. 8 valve NO NITROUS!!

  6. #6

    Re: Follow the tubes!

    Quote Originally Posted by Warren Stramer View Post
    Nice! Aaron, by the time you are done building that you will see tubes in your sleep.
    Call me psycho, but to try to get myself to calm down and relax to fall asleep I've been kind of mapping out in my head just what angles I want to use to get the collector's just right, and where to position them.

    As far as the welding goes... do you have a guesstimation on how things are looking? The ones pictured are single pass. I'm not getting huge penetration on the backside, so I'm thinking of doing a first fusion only pass (tube fitment is plenty tight for it, and the thick stuff goes together nicely!) and then a finish pass afterwards. Thoughts? Most of the joints are beveled, but not all of them.

  7. #7

    Re: Follow the tubes!

    Quote Originally Posted by 8valves View Post
    Call me psycho, but to try to get myself to calm down and relax to fall asleep I've been kind of mapping out in my head just what angles I want to use to get the collector's just right, and where to position them.

    As far as the welding goes... do you have a guesstimation on how things are looking? The ones pictured are single pass. I'm not getting huge penetration on the backside, so I'm thinking of doing a first fusion only pass (tube fitment is plenty tight for it, and the thick stuff goes together nicely!) and then a finish pass afterwards. Thoughts? Most of the joints are beveled, but not all of them.
    Welding looks fine as long as you are running gas inside the pipe you will be fine.
    I would be more concerned about the weight of the tubing. that pipe is pretty heavy to be making as long as you explained to me. hope you have some good supports in the map in your head
    best 1/8 ET-6.16 sec. best 1/8 speed-119.70 Best 1/4 MPH 145.5, Best 1/4 ET 9.65 sec. 8 valve NO NITROUS!!

  8. #8
    boostaholic
    Join Date
    Jan 2006
    Location
    Bridgeport WV
    Posts
    1,329

    Re: Follow the tubes!

    Looking good.I hope it all fits where you want it.

  9. #9
    Hot Certified Christians at TD! Turbo Mopar Staff Directconnection's Avatar
    Join Date
    Dec 2005
    Location
    Nunya-Maine
    Posts
    6,027

    Re: Follow the tubes!

    Quote Originally Posted by Warren Stramer View Post
    Welding looks fine as long as you are running gas inside the pipe you will be fine.
    I would be more concerned about the weight of the tubing. that pipe is pretty heavy to be making as long as you explained to me. hope you have some good supports in the map in your head

    You need to run argon inside the pipe? How?

    My welded el manifold, I need to plug two small egt probe holes and an area that wasn't welded on the inside. I am worried about welding it and it forming a crack. What should I do? We have a machineable rod called ny-rod or something to that effect. If it's not generating much for heat, will i be able to lay a simple 1" bead without causing an issue? Or, should the manifold be brought up to a ceetain temp and mig welded which i am not familiar with wire types, etc. I just turn it on and set the amps and wire settings.
    Quote Originally Posted by 22mopar
    have a look at my feedback on the forum. all positive.

    Steve

    '90 VNT competition package Shadow - T-III SC6262 conversion/restoration
    '91 Spirit R/T - white
    '91 Spirit R/T - white
    '92 IROC R/T - red
    '67 Barracuda 273 now, 440/727 awaits....

  10. #10
    Hot Certified Christians at TD! Turbo Mopar Staff Directconnection's Avatar
    Join Date
    Dec 2005
    Location
    Nunya-Maine
    Posts
    6,027

    Re: Follow the tubes!

    Aaron, how much are those sections and where do you get them? I had no idea they are cast looking at them from the pics.
    Quote Originally Posted by 22mopar
    have a look at my feedback on the forum. all positive.

    Steve

    '90 VNT competition package Shadow - T-III SC6262 conversion/restoration
    '91 Spirit R/T - white
    '91 Spirit R/T - white
    '92 IROC R/T - red
    '67 Barracuda 273 now, 440/727 awaits....

  11. #11

    Re: Follow the tubes!

    This is all reference to TIG stuff, as far as backpurging. You run a separate tank, or a split regulator and run a small tube into the piping and seal off the exits except for some pinholes in the tape, or aluminum foil, whatever you use to seal it up. This way the backside of the weld doesn't get contaminated.

    EDIT: www.acestainless.com

    It's not exactly cheap. Look under SS pipe, 1.5" for straight sections at $8.XX a foot, and butt weld 90* in 1.5" schedule 10 for $5.79 per bend. It adds up.

  12. #12

    Re: Follow the tubes!

    Quote Originally Posted by Directconnection View Post
    You need to run argon inside the pipe? How?

    My welded el manifold, I need to plug two small egt probe holes and an area that wasn't welded on the inside. I am worried about welding it and it forming a crack. What should I do? We have a machineable rod called ny-rod or something to that effect. If it's not generating much for heat, will i be able to lay a simple 1" bead without causing an issue? Or, should the manifold be brought up to a ceetain temp and mig welded which i am not familiar with wire types, etc. I just turn it on and set the amps and wire settings.
    Back purging only applies to the stainless steel family, weather you are welding with TIG or MIG. the back side of the weld will "sugar" and be very weak and likely crack if not back purged. I think that is why some of the headers coming from china are junky.
    If you look inside the tube of a stainless header weld, (that has been back purged) you will see a perfect bead that is almost a mirror image of the outside weld bead. Magic
    If you are welding mild steel a back purge would certainly help the weld integrity but not necesary.
    best 1/8 ET-6.16 sec. best 1/8 speed-119.70 Best 1/4 MPH 145.5, Best 1/4 ET 9.65 sec. 8 valve NO NITROUS!!

  13. #13
    Hybrid booster
    Join Date
    Dec 2005
    Location
    Clermont, Florida
    Posts
    452

    Re: Follow the tubes!

    Looks good, where did you get your pipes from?

  14. #14

    Re: Follow the tubes!

    Quote Originally Posted by Directconnection View Post
    Aaron, how much are those sections and where do you get them? I had no idea they are cast looking at them from the pics.
    Quote Originally Posted by 8valves View Post
    www.acestainless.com

    It's not exactly cheap. Look under SS pipe, 1.5" for straight sections at $8.XX a foot, and butt weld 90* in 1.5" schedule 10 for $5.79 per bend. It adds up.
    Quote Originally Posted by Dez View Post
    Looks good, where did you get your pipes from?
    Check out above...

  15. #15
    Hybrid booster
    Join Date
    Dec 2005
    Location
    Clermont, Florida
    Posts
    452

    Re: Follow the tubes!

    Cool, thanks.

  16. #16
    Super Moderator Turbo Mopar Staff contraption22's Avatar
    Join Date
    Dec 2005
    Location
    Havertown, PA
    Posts
    9,517

    Re: Follow the tubes!

    Nice work Aaron. Looking forward to seeing it all done!
    Mike Marra
    1986 Plymouth Horizon GLMF "The Contraption" < entertaining sponsorship offers
    Project Log:
    http://www.turbo-mopar.com/forums/showthread.php?69708-The-Contraption-2013-14&highlight=

  17. #17
    Hybrid booster
    Join Date
    Jan 2006
    Location
    Crestline, OH
    Posts
    357

    Re: Follow the tubes!

    Looks nice Aaron. Give me a call sometime next week I'll come check it out.

  18. #18

    Re: Follow the tubes!

    Quote Originally Posted by 20w/ashelby View Post
    Looks nice Aaron. Give me a call sometime next week I'll come check it out.
    Too bad I'm up in MI now for the summer. I got an internship that I couldn't pass up, so I'll be back at the end of August. I will be coming down on weekends every once in a while to try and get it done this year.

  19. #19
    TIIFIIIWII Turbo Mopar Staff DodgeZ's Avatar
    Join Date
    Dec 2005
    Location
    Texas
    Posts
    4,307

    Re: Follow the tubes!

    Quote Originally Posted by 8valves View Post


    That's the only teaser you guys get 'till it's nearly done.
    how are you going to get the lower bolt out?
    2022 Viper runs 9s

  20. #20

    Re: Follow the tubes!

    There is actually plenty of clearance to access every bolt, both exhaust AND intake AND starter without removing anything from the vehicle when all parts are installed.

    It's simply a bad camera angle for that particular bolt head. If you look at the #1 runner next to it, those two tubes are the same bend and installed parallel to each other, so the clearance there is the same.

Page 1 of 2 12 LastLast

Tags for this Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •